How To Lay The Track Of Electric Platform Cart?

Data: 2025-02-01 17:15:45

The laying of electric platform cart tracks is a meticulous and important process. Certain steps and precautions need to be followed to ensure the stability and safety of the tracks. The laying of electric platform cart tracks requires at least three processes - preliminary preparation, foundation construction and actual track laying. The following are the detailed steps for laying electric platform cart tracks:
1. Preparation
First, check the environmental conditions of the laying site, including ground flatness, load-bearing capacity, power supply, etc., to ensure that the installation and operation requirements of the electric platform cart are met. Then prepare the required track materials, such as rails, fasteners, pads, rubber pads, bolts, etc., and ensure that the quality of these materials is reliable. Then, according to the operating requirements of the electric platform cart and the site environment, accurately calculate and plan the track direction, length, elbows, etc.

Xinxiang New Leader Machinery Manufacturing Co., Ltd.
2. Foundation construction
Foundation treatment: Determine the size and load-bearing capacity of the foundation according to the size and weight of the electric platform cart. Then carry out foundation construction, including excavation, concrete pouring, etc., to ensure that the flatness and bearing capacity of the foundation meet the requirements. During the construction of the foundation, attention should be paid to waterproof, moisture-proof and anti-corrosion measures to extend the service life of the electric platform cart and track.
3. Track laying
The track needs to be tacked, fixed and adjusted. During the laying process, the straightness, horizontality and gauge of the track should be constantly checked and adjusted to ensure that the error is as small as possible.
After the track is installed, grouting is performed to fix the track and enhance the stability of the track. When grouting, pay attention to the control of water volume and temperature, generally between 5 degrees and 35 degrees, and the mixing time should be controlled within a reasonable range. After grouting, fill the holes with cement in time to ensure that there are no gaps around the track.